COFFEE&TEA DRINKS
VR

Shinelong Project Cases Reference

Shinelong Project Cases Reference
1
1
Send inquiry online about the project information, information must include kitchen size, cuisine type, capacity of guest for every meal
1
1
Consultant team contact customers and arrange design,first comes with floor design, when floor design confirmed, 3D design can be arranged
1
1
Sales team makes quotation according to confirmed design, quotation includes all cost of kitchen equipment, if needed, shipping cost can be quoted,too
1
1
Sign sales contract to start producs fabrication,usually fabrication will take about 30 days. For brand Furnotel products, there are some ready stock, such as cooking unit,refrigeration equipment,snack equipment and so on.
1
1
Quality control and checking before deliver to vessel company, all the equipment will be tested before shipping. But be awared that there would be damage during transportation no matter by sea or by air.
1
1
Installation instruction or on site instruction and training for usage of equipment. Anytime if service is needed, sales team will stand by online.
1
1
After-sales problem will be responded in 24 hours, usually it's 1 year warranty, but service will last as long as you want.
Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --
Chat with Us

Send your inquiry

Attachment:
    Choose a different language
    English
    Pilipino
    ภาษาไทย
    Bahasa Melayu
    bahasa Indonesia
    فارسی
    русский
    Português
    italiano
    français
    Español
    Deutsch
    العربية
    Tiếng Việt
    Монгол
    Nederlands
    Current language:English